Our Projects

Ongoing – Tiles Vanity Counters for Export to Saudi Arabia

  • We are currently working on the production of over 500 tiled vanity counters for one of our valued clients. These units are being manufactured as per the approved specifications and quality standards. Once completed, the entire batch will be exported to Saudi Arabia, ensuring all packaging and logistics meet international export requirements.

Ongoing – Outdoor Dry Cladding for Residential Building in Liwan 2

  • Scope of Work:
    • Supply and installation of 2,300 m² limestone dry cladding using mechanical angles and adhesive, including material provision, skilled installation, fixing accessories, and quality supervision

Damac Lagon – Dubai

  • Landscaping Work (Project Central Hub): Granite Material Supply (950 m2), Flaming, Cutting for Project Central Hub Damac Lagon – Dubai
  • Granite Material Supply & Cutting for Water Features
    • Total Area: 1,900 m²
    • Description: Supply of high-quality granite material along with precision cutting and shaping services tailored for custom-designed water features at Project Gateway. All granite will be processed in accordance with the approved design specifications to ensure seamless installation and aesthetic consistency.
  • Groove Quantity Supply & Installation
    • Total Groove Area: 456 m²
    • Description: Cutting of linear grooves on selected granite surfaces to meet design, drainage, or anti-slip requirements.

Ras Al-Khaimah

  • Landscaping Work: Granite Material Supply (1300 m2) & Cutting for Waldorf Astoria – Ras Al-Khaimah
  • Swiming Pool Channel: Template making, Material Supply (Appx 230 m2), Cutting, Waterjet Hol & Installation for Signature Pool
  • Water Feature: Granite material Supply (apx 240 m2) for Signature Pool
  • Pool Signature Marking: (for No-diving & Depth in meter), Water cutting, fabrication & Installation on the site for Signature Pool
  • Porcelain Tiles: Material Supply( Appx 10,460 m2) & Cutting for Sofitel – Signature Pool

Frond D, Villa 119:

Material Supply & Installation of Kitchen Counters, Vanity & Shelf Counter in entire Washroom, Outdoor Steps & Riser, Outdoor Floor (Apps 320 m2).

Frond D, Villa 53:

Material Supply & Installation of Vanity Top Counters & Shelfs.

Genetic – Level 5 – Office 5, Unit 8, One Central DWTC:

Material Supply & Installation of the Floor

Furjan Villa 88:

Material Supply & Installation of Steps & Riser , Kitchen Top Counter, Vanity & Shelf Counter in entire washroom and Front Wall Cladding

Dubai Marina – River Town:

Material Supply & Installation of Kitchen Top Counter (Quartz).

Venetian Building – Apartment 1013:

Material Supply & Installation of Kitchen Top counter (Granite) & Iceland Counter.

Al Rimal – Apartment 3302 :

Material Supply & Installation of Kitchen Top Counters (Granite) & Iceland Counter.

Damat 2 Ekoya – Coursetia Villa 36,

Material Supply & Installation of the Kitchen Top Counter & Black Splash.

Al Murjan Tower – Apartment # 1607:

Material Supply & Installation of Kitchen Top counter , Vanity Top Counter & Threshold of entire apartment.

JVC – Indigo Ville 3 – Villa 18:

Material Supply & Installation of the Kitchen Top counter .

Al Burooj Residence 1 – Villa 8:

Material Supply & Installation of the Kitchen Top counter, Backsplash, Vanity Counters in entire washroom

The Fairways East Tower – Apartment 2605:

Material Supply & Installation of the Kitchen Top Counter.

Al Burooj Residence 1:

Material Supply & Installation of the Kitchen Top Counter.