{"id":4152,"date":"2022-11-13T11:56:41","date_gmt":"2022-11-13T11:56:41","guid":{"rendered":"https:\/\/adaamarble.ae\/?page_id=4152"},"modified":"2025-07-23T08:31:27","modified_gmt":"2025-07-23T08:31:27","slug":"our-projects","status":"publish","type":"page","link":"https:\/\/adaamarble.ae\/index.php\/our-projects\/","title":{"rendered":"Our Projects"},"content":{"rendered":"\n<p class=\"has-medium-font-size\"><strong>Ongoing  &#8211; Tiles Vanity Counters for Export to Saudi Arabia<\/strong>  <\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>We are currently working on the <strong>production of over 500 tiled vanity counters<\/strong> for one of our valued clients. These units are being manufactured as per the approved specifications and quality standards. Once completed, the entire batch will be <strong>exported to Saudi Arabia<\/strong>, ensuring all packaging and logistics meet international export requirements.<\/li>\n<\/ul>\n\n\n\n<p class=\"has-medium-font-size\"><strong>Ongoing  &#8211; Outdoor Dry Cladding for Residential Building in Liwan 2<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Scope of Work:<\/strong>\n<ul class=\"wp-block-list\">\n<li>Supply and installation of 2,300 m\u00b2 limestone dry cladding using mechanical angles and adhesive, including material provision, skilled installation, fixing accessories, and quality supervision<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<p class=\"has-medium-font-size\"><strong>Damac Lagon &#8211; Dubai<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Landscaping Work (Project Central Hub):<\/strong> Granite Material Supply (<strong>950 m2<\/strong>), Flaming, Cutting for Project Central Hub Damac Lagon &#8211; Dubai<\/li>\n\n\n\n<li><strong>Granite Material Supply &amp; Cutting for Water Features<\/strong>\n<ul class=\"wp-block-list\">\n<li><strong>Total Area:<\/strong> 1,900 m\u00b2<\/li>\n\n\n\n<li><strong>Description:<\/strong> Supply of high-quality granite material along with precision cutting and shaping services tailored for <strong>custom-designed water features<\/strong> at <strong>Project Gateway<\/strong>. All granite will be processed in accordance with the approved design specifications to ensure seamless installation and aesthetic consistency.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>Groove Quantity Supply &amp; Installation<\/strong>\n<ul class=\"wp-block-list\">\n<li><strong>Total Groove Area:<\/strong> 456 m\u00b2<\/li>\n\n\n\n<li><strong>Description:<\/strong> Cutting of linear grooves on selected granite surfaces to meet design, drainage, or anti-slip requirements.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<p class=\"has-medium-font-size\"><strong>Ras Al-Khaimah<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Landscaping Work:<\/strong> Granite Material Supply (<strong>1300 m2<\/strong>) &amp; Cutting for Waldorf Astoria &#8211; Ras Al-Khaimah<\/li>\n\n\n\n<li><strong>Swiming Pool Channel<\/strong>: Template making, Material Supply (Appx 230 m2), Cutting, Waterjet Hol &amp; Installation for Signature Pool <\/li>\n\n\n\n<li><strong>Water Feature:<\/strong> Granite material Supply (apx <strong>240 m2<\/strong>) for Signature Pool<\/li>\n\n\n\n<li><strong>Pool Signature Marking<\/strong>: (for No-diving &amp; Depth in meter), Water cutting, fabrication &amp; Installation on the site for Signature Pool<\/li>\n\n\n\n<li><strong>Porcelain Tiles:<\/strong> Material Supply( Appx <strong>10,460 m2<\/strong>) &amp; Cutting for Sofitel &#8211; Signature Pool<\/li>\n<\/ul>\n\n\n\n<p><strong>Frond D, Villa 119:<\/strong> <\/p>\n\n\n\n<p>Material Supply &amp; Installation of Kitchen Counters, Vanity &amp; Shelf Counter in entire Washroom, Outdoor Steps &amp; Riser, Outdoor Floor (Apps <strong>320 m2<\/strong>).<\/p>\n\n\n\n<p><strong>Frond D, Villa 53: <\/strong><\/p>\n\n\n\n<p>Material Supply &amp; Installation of Vanity Top Counters &amp; Shelfs.<\/p>\n\n\n\n<p><strong>Genetic &#8211; Level 5 &#8211; Office 5, Unit 8, One Central DWTC: <\/strong><\/p>\n\n\n\n<p>Material Supply &amp; Installation of the Floor<\/p>\n\n\n\n<p><strong>Furjan Villa 88:<\/strong> <\/p>\n\n\n\n<p>Material Supply &amp; Installation of Steps &amp; Riser , Kitchen Top Counter, Vanity &amp; Shelf Counter in entire washroom and Front Wall Cladding<\/p>\n\n\n\n<p><strong>Dubai Marina &#8211; River Town: <\/strong><\/p>\n\n\n\n<p>Material Supply &amp; Installation of Kitchen Top Counter (Quartz).<\/p>\n\n\n\n<p><strong>Venetian Building &#8211; Apartment 1013: <\/strong><\/p>\n\n\n\n<p>Material Supply &amp; Installation of Kitchen Top counter (Granite) &amp; Iceland Counter.<\/p>\n\n\n\n<p><strong>Al Rimal &#8211; Apartment 3302 :<\/strong><\/p>\n\n\n\n<p>Material Supply &amp; Installation of Kitchen Top Counters (Granite) &amp; Iceland Counter.<\/p>\n\n\n\n<p><strong>Damat 2 Ekoya &#8211; Coursetia Villa 36, <\/strong><\/p>\n\n\n\n<p>Material Supply &amp; Installation of the Kitchen Top Counter &amp; Black Splash.<\/p>\n\n\n\n<p><strong>Al Murjan Tower &#8211; Apartment # 1607: <\/strong><\/p>\n\n\n\n<p>Material Supply &amp; Installation of Kitchen Top counter , Vanity Top Counter &amp; Threshold of entire apartment.<\/p>\n\n\n\n<p><strong>JVC &#8211; Indigo Ville 3 &#8211; Villa 18:<\/strong> <\/p>\n\n\n\n<p>Material Supply &amp; Installation of the Kitchen Top counter .<\/p>\n\n\n\n<p><strong>Al Burooj Residence 1 &#8211; Villa 8:<\/strong> <\/p>\n\n\n\n<p>Material Supply &amp; Installation of the Kitchen Top counter, Backsplash, Vanity Counters in entire washroom<\/p>\n\n\n\n<p><strong>The Fairways East Tower &#8211; Apartment 2605:<\/strong> <\/p>\n\n\n\n<p>Material Supply &amp; Installation of the Kitchen Top Counter.<\/p>\n\n\n\n<p><strong>Al Burooj Residence 1:<\/strong><\/p>\n\n\n\n<p>Material Supply &amp; Installation of the Kitchen Top Counter.<br><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ongoing &#8211; Tiles Vanity Counters for Export to Saudi Arabia Ongoing &#8211; Outdoor Dry Cladding for Residential Building in Liwan 2 Damac Lagon &#8211; Dubai Ras Al-Khaimah Frond D, Villa 119: Material Supply &amp; Installation of Kitchen Counters, Vanity &amp; Shelf Counter in entire Washroom, Outdoor Steps &amp; Riser, Outdoor Floor (Apps 320 m2). Frond<br \/><a class=\"moretag\" href=\"https:\/\/adaamarble.ae\/index.php\/our-projects\/\">+ Read More<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"templates\/page-fullwidth_template.php","meta":{"om_disable_all_campaigns":false,"_mi_skip_tracking":false,"footnotes":""},"class_list":["post-4152","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/adaamarble.ae\/index.php\/wp-json\/wp\/v2\/pages\/4152","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/adaamarble.ae\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/adaamarble.ae\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/adaamarble.ae\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/adaamarble.ae\/index.php\/wp-json\/wp\/v2\/comments?post=4152"}],"version-history":[{"count":14,"href":"https:\/\/adaamarble.ae\/index.php\/wp-json\/wp\/v2\/pages\/4152\/revisions"}],"predecessor-version":[{"id":4460,"href":"https:\/\/adaamarble.ae\/index.php\/wp-json\/wp\/v2\/pages\/4152\/revisions\/4460"}],"wp:attachment":[{"href":"https:\/\/adaamarble.ae\/index.php\/wp-json\/wp\/v2\/media?parent=4152"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}